Biometric Software Installation for Pro builders Inc., Lapu-lapu Branch. Introduction InstallersPH IT Solutions recently completed a biometric software installation for Pro Builders Inc. – Lapu-Lapu Branch. The installation aimed to streamline and …
Computer Placement of the RFID Automatic Boom Barrier for Cherubim -- 7th Update.

Introduction
As part of our continued commitment to enhancing access control systems for our valued clients, InstallersPH IT Solutions recently conducted the 7th progress update for the RFID Automatic Boom Barrier System at Cherubim. This phase of the project focused on assessing and improving the physical setup for the system computer, which is responsible for managing the boom barrier’s operations.
Importance of Proper Computer Placement.
In an RFID Automatic Boom Barrier setup, the computer plays a central role in processing data from RFID readers, logging entry and exit times, and ensuring accurate and real-time system operation. While the computer hardware and software were fully functional, it became clear that its placement and working environment needed improvement for optimal performance and usability.
Site Inspection and Evaluation.
During this progress update, our team conducted a site inspection focused on the placement and setup area for the computer. Rather than performing technical diagnostics, this stage involved evaluating the physical workspace where the new computer will be installed.
Key considerations during the inspection included:
Table or workspace availability: Ensuring that there is a stable, secure, and ergonomic table where the computer can be placed without risk of vibration or exposure to environmental damage.
Location assessment: Verifying that the chosen location is accessible for operators, has sufficient ventilation, and is near essential power and network connections.
Cable management: Identifying proper cable routing to maintain a clean and organized setup while minimizing tripping hazards or interference.
Safety and security: Reviewing the visibility and security of the area to ensure that the system cannot be easily tampered with and is protected from unauthorized access.
The outcome of the inspection confirmed the need to slightly adjust the computer placement to optimize both operator convenience and system connectivity. This also ensures the computer will remain protected from environmental factors such as dust, moisture, or accidental contact.
System Benefits Moving Forward.
With the improved computer placement, Cherubim can expect:
Better accessibility for operators monitoring the RFID system
Increased safety and durability for the computer setup
Improved efficiency in logging and accessing attendance or entry logs
A professional and organized workspace
Conclusion
At InstallersPH IT Solutions, we understand that even small improvements—like workstation enhancements—can make a big difference in long-term system performance. This progress update reinforces our dedication to both technical excellence and user convenience.
We remain committed to supporting Cherubim and look forward to the next phase of the project as we continue to fine-tune and maintain their RFID Automatic Boom Barrier system.
Case Studies
Starlink Site Inspection at 82 Vibo Center. Introduction InstallersPH IT Solutions recently conducted a Starlink site inspection at the client’s office located at 82 Vibo Center, Cebu City. The client expressed their …
PABX Telephone Site Inspection at Lynolds Marketing.
PABX Telephone Site Inspection at Lynolds Marketing. Introduction Lynolds Marketing recently requested a site inspection for the installation of a PABX (Private Automated Branch Exchange) telephone system to resolve persistent internal communication …