CCTV Supply and Installation at Roz Laboratory Consolacion -- 3rd Progress Update.

Introduction

The ongoing CCTV installation project at Roz Laboratory has made substantial progress in recent days. The technical team has successfully completed the drilling work required to prepare cable pathways throughout the facility. However, the installation process has been temporarily paused as the client procures additional Cat6 cables, which are essential for completing the wiring stage of the project.

Drilling and Cable Pathway Preparation

One of the key stages in CCTV installation is creating proper cable routes to ensure neat, efficient, and secure wiring. At Roz Laboratory, the installation team began by identifying the optimal locations for cable runs, considering both functionality and aesthetics. Once the layout was finalized, the team carried out precise drilling at designated points, making holes through walls and ceilings to allow for unobstructed cable placement.

This preparatory work is critical, as it ensures the wiring can be installed without obstruction and that cables remain protected from environmental damage. The drilling was completed with care to maintain the structural integrity of the facility while aligning with the planned camera placement points.

Next Steps

Once the additional Cat6 cables arrive, the installation team will resume work immediately. The next tasks will involve running the cables through the prepared pathways, securing them properly, and connecting them to each camera location. This will be followed by mounting the CCTV cameras, adjusting their angles, and testing their video feeds to ensure optimal coverage.

Finally, the cameras will be integrated into the central monitoring system, allowing the security team at Roz Laboratory to benefit from real-time surveillance and recorded footage for future reference.

Conclusion

The CCTV installation project at Roz Laboratory is progressing efficiently despite the temporary pause due to a cable shortage. The completion of drilling and cable pathway preparation represents a major step toward achieving a fully operational security system. By taking the time to acquire the proper Cat6 cabling, the client is ensuring that the final system will meet modern performance standards, offering reliability and high-quality video output.

Once the remaining materials arrive, the project is expected to proceed without further delay, ultimately enhancing the safety and security of Roz Laboratory’s premises.

Case Studies

Firewall Configuration at Chicky Oink — 3rd Progress Update. Introduction. The third progress update for the firewall configuration project at Chicky Oink represents an important advancement in fortifying the client’s network security …

CCTV & Structured Cabling Supply and Installation at Punched Coffee, Johndorf Tower — 4th progress Update. Introduction. The fourth progress update for the CCTV and structured cabling supply and installation at Punched …

CCTV Online App Setup at San Jose Pension House. Introduction. San Jose Pension House recently enhanced its security management by implementing DMSS remote viewing for its CCTV system. Our team successfully configured …