CCTV and Stuctured Cabling Installation at Amara Residences -- 2nd Progress Update.

Introduction.

Amara Residences continues to move forward with its structured cabling and CCTV installation project. This initiative aims to provide residents with both enhanced security and dependable connectivity by integrating modern infrastructure across the property. After the initial groundwork was completed during the first phase, the focus of the second progress update was on installing fiber connections and setting up the main data cabinet on the second floor. These steps mark an important transition from early preparation to building the system’s operational core.

Fiber Integration.

Fiber was introduced during this stage to strengthen the backbone of the network. Unlike traditional cabling, fiber provides far greater speed and reliability, ensuring that the residence can handle the high bandwidth demands of both CCTV and future connectivity needs. The team worked carefully to route and secure the fiber, paying close attention to handling requirements since even small bends or pressure points can compromise performance. With the fiber now in place, Amara Residences is positioned to benefit from a more scalable and future-ready network foundation.

Data Cabinet Setup.

Alongside the fiber installation, the team established the data cabinet on the second floor. This cabinet serves as the central hub for the structured cabling system, where all cables, devices, and connections will eventually converge. Inside, the layout was organized to accommodate patch panels, network switches, and power distribution units. Proper setup at this stage ensures that the system will be easier to manage, maintain, and expand as the project progresses. The cabinet’s location was chosen for security and accessibility, balancing ease of service with protection against unauthorized access.

Site Challenges and Next Step.

While steady progress was made, the absence of piping infrastructure created some limitations. Without conduits, certain cable pathways could not yet be finalized, leaving parts of the system incomplete. Piping is critical to protecting cables from wear and ensuring a neat, durable installation. This will require close coordination with the client’s construction team before the project can advance further.

Despite this hurdle, the next steps are already in view. The upcoming phase will involve installing access points to extend Wi-Fi coverage throughout the residence, complementing the fiber backbone and supporting both residents and staff. Once conduits are in place, the team will finalize additional CCTV and network cable routes, followed by thorough testing of both fiber and copper lines to ensure they meet performance and reliability standards.

Conclusion.

The second progress update at Amara Residences demonstrates meaningful progress with the installation of fiber and the setup of the second-floor data cabinet. These milestones form the foundation for the property’s integrated network and security system, bringing the project one step closer to completion.

Although conduit installation is still pending, the work completed so far provides a strong backbone that will support the next phases, including access point deployment and final cabling. With careful planning and steady collaboration, the project is well on its way to delivering a secure and future-ready infrastructure for Amara Residences.

Case Studies

CCTV PMS for Punched Coffee at Jondorf Tower. Introduction. On October 2, 2025, the team carried out a scheduled Preventive Maintenance Service (PMS) for the newly installed CCTV system and access points …

IT Support for File Sharing at Chicky’Oink. Introduction. In today’s fast-paced business environment, efficient data sharing plays a vital role in ensuring smooth operations. Businesses rely heavily on well-structured IT networks that …

CCTV Support at Lapu-Lapu, Maribago. Introduction. At InstallersPH IT Solutions, we believe that after-sales support is just as essential as the initial installation. Recently, our team was called to provide technical assistance …