Supply and Installation of Boom Barrier at RMC Hospital Guagua Pampanga -- 1st Progress Update.

Introduction
Our team has made significant progress in the Supply and Installation of an Automated Boom Barrier System at RMC Hospital in Guagua, Pampanga. This first progress report details the completed groundwork, including excavation and the laying of PVC pipes for fiber optic and electrical cabling, which are essential for the barrier’s operation and connectivity.
Work Accomplished (1st Progress Phase).
1. Excavation of Ground for PVC Pipe Installation.
To prepare for the underground wiring system, our team conducted precise excavation work along the designated pathways. Key activities included:
Site Survey & Marking – Ensured proper alignment while avoiding existing underground utilities.
Manual & Mechanical Digging – Excavated trenches 30-40 cm deep and 15-20 cm wide for optimal pipe placement.
Debris Removal & Leveling – Cleaned and compacted the trench base to prevent future settling.
2. Laying Out PVC Pipes for Fiber Optic & Electrical Cabling.
High-quality PVC conduits (20mm & 25mm diameter) were installed to protect and route:
Fiber optic cables (for network connectivity and barrier control signals).
Electrical wiring (for power supply to the boom barrier motor).
Key Steps Performed:
✔ Pipe Cutting & Fitting – Custom-sized to fit the trench layout.
✔ Secure Joint Connections – Used PVC solvent cement for waterproof and durable seals.
✔ Pull Wire Insertion – Facilitates future cable installation.
✔ Backfilling & Compaction – Ensured stability and surface restoration.
Ensuring Quality & Safety in Underground Works.
The successful completion of the excavation and PVC pipe laying marks a crucial step in ensuring the boom barrier system’s long-term reliability. Proper underground conduit installation provides:
✔ Protection for Cables – Prevents damage from moisture, soil pressure, and external factors.
✔ Future-Proof Infrastructure – Allows easy maintenance or upgrades without major digging.
✔ Neat & Organized Wiring – Reduces clutter and ensures a professional installation.
Our team followed industry standards in trenching and pipe laying to guarantee durability and compliance with safety regulations.
Looking Ahead.
Further updates will be provided once the next phase is confirmed and underway. We appreciate the hospital administration’s support as we work to deliver a secure and efficient access control system.
Conclusion
The first phase of the project has been completed efficiently, ensuring a solid foundation for the boom barrier’s electrical and data connectivity. Our team remains committed to delivering a reliable, high-security access control system for RMC Hospital.
Case Studies
CCTV Support for another resident at Silver Hills, Talamban. Introduction Our team responded to a service call from a Silver Hills residence regarding their 9-camera analog CCTV system, where 5 cameras had …
Site Inspection for Boom Barrier with RFID Ticketing System at RMC Rosario Medical Center of Guagua, Inc.
Site Inspection for Boom Barrier with RFID Ticketing System at RMC Rosario Medical Center of Guagua, Inc. Introduction Efficient traffic management is crucial for hospitals and medical centers, where smooth vehicle flow …