Starlink Site Inspection at Campion Aba Inc.

Introduction

Our team recently completed a detailed site evaluation for Starlink satellite internet installation at Campion Aba Inc.’s first-floor commercial space within City Time Square Mandaue, Cebu. This comprehensive report documents our findings regarding the challenging installation environment and outlines the agreed-upon implementation approach with the client.

Site Overview and Constraints

The assessment location presents multiple unique challenges for satellite connectivity:

Structural Limitations

The unit is completely enclosed beneath the mall’s concrete roof structure.

No accessible outdoor spaces for alternative mounting.

Permanent architectural features blocking satellite visibility.

High-density building materials causing potential signal interference.

Installation Restrictions

Limited options for cable routing in public spaces.

No permitted locations for additional networking equipment.

Client Requirements

Must function within existing space constraints.

No structural modifications permitted.

Implementation Agreement

Trial Installation Parameters

Starlink Gen 3 hardware will be installed temporarily.

A trial period to monitor performance.

Daily connectivity logs will be maintained.

Client will provide real-time usage feedback.

Performance Evaluation Criteria

Consistent service availability during business hours.

Reliable connection for standard business applications.

Acceptable performance for video conferencing.

Stable connectivity across all workstations.

Decision Protocol

If performance meets operational needs: Proceed with permanent installation.

If performance is unsatisfactory: Complete removal of all equipment.

No secondary attempts or alternative configurations will be made.

Professional Assessment
Based on our evaluation of the physical environment:

The installation faces significant technical challenges.

Satellite visibility is severely constrained.

There is minimal margin for error in placement.

Performance may be marginal at best.

Conclusion

Our comprehensive site inspection at Campion Aba Inc. has provided critical insights into the feasibility of Starlink installation in this unique mall environment. The assessment revealed several important considerations that will determine the success of this satellite internet solution.

Primary Observations:

The selected installation site offers only partial northern sky visibility, with complete overhead obstruction from the mall’s concrete roof structure.

Cable routing options are strictly limited by physical constraints.

Router placement is confined to predetermined locations within the office space.

Installation Viability:

The trial installation will serve as the definitive test of whether Starlink can overcome these environmental challenges.

Performance will be evaluated based on real-world business usage requirements.

No secondary options exist if the initial installation proves unsatisfactory.

Recommendations:
While we will proceed with the trial installation as agreed, the inspection findings strongly suggest that clients consider:

Developing contingency plans for alternative connectivity solutions.

Exploring supplemental networking options should Starlink performance be inconsistent.

Preparing for potential service limitations during inclement weather.

This inspection has provided Campion Aba Inc. with valuable information about their satellite internet options in this challenging location. The trial installation will now determine whether the system can meet their operational needs within these physical constraints.

 

 

Case Studies

CCTV support at Bridge Culture — Final update. Introduction Following our recent inspection at Bridge Culture IT Tower in Kasambagan, Cebu City, our team returned on-site to implement the corrective action needed …

CCTV Site Inspection at ROZ Laboratories Inc. Introduction The initial site inspection for the CCTV supply and installation project at ROZ Laboratories Inc. marks the first step toward deploying a robust surveillance …

CCTV Supply and Installation at San Jose Pension House — Second Progress Update. Introduction Following the groundwork laid during the initial phase, our technical team proceeded with the second stage of the …