CCTV Site Inspection at University of Visayas Maritime. Introduction In today’s security-conscious environment, educational institutions must prioritize robust surveillance systems to protect their assets, students, and staff. The University of Visayas Maritime …
CCTV Supply and Installation at ACS Manufacturing Corporation -- 3rd Progress.

Introduction
The CCTV installation project at ACS Manufacturing Corporation continues to advance with consistent progress. Now entering its third phase, our team has begun precise measurement and preparation of flexible hose conduit and Cat6 network cables that will connect the previously mounted PVC junction boxes to future CCTV camera units. This stage may seem technical and detail-oriented, but it’s a vital link in ensuring the integrity, reliability, and scalability of the surveillance infrastructure.
Progress Video.
Preparing for Secure Connectivity.
After successfully laying out structured PVC pipings and strategically mounting PVC junction boxes throughout the facility, our attention has turned to routing the internal wiring components. The latest work involved measuring the exact lengths of Cat6 cables and flexible conduit hoses that will house and protect these cables from environmental and mechanical interference.
These components will connect each CCTV camera’s data and power lines to their respective junction boxes and onward to the main control system. To minimize excess slack and reduce signal loss, measurements were done carefully with consideration to bends, elevations, and obstructions within the environment.
Flexible hoses are particularly useful in tight or dynamic installation zones—such as areas with moving machinery or non-linear surfaces—where rigid PVC pipes would not be ideal. These hoses allow smoother routing and additional protection for the Cat6 cables while maintaining neatness and industrial-grade safety.
Accuracy Matters.
In any surveillance setup, precision in cable length and routing is essential. Overextended cables can create slack that risks damage or disorganization, while cables that are too short lead to unnecessary splicing or replacement, which compromises signal integrity and increases costs.
By measuring in advance and planning cable routes in coordination with the existing piping layout, we are ensuring a clean and efficient installation process in the coming stages. These careful measurements are being recorded and labeled per camera junction point, forming part of the system documentation that will support future maintenance or expansions.
Supporting Industrial Standards.
The use of Cat6 Ethernet cables ensures high-speed data transmission with low interference—ideal for high-resolution CCTV systems that require stable real-time video feeds and recording. The flexible conduit, meanwhile, adds an additional layer of protection from dust, moisture, and physical stressors—ensuring that even the hidden parts of the system meet the rigorous demands of an industrial environment like ACS.
This meticulous groundwork not only supports the system’s initial functionality but sets a strong standard for long-term durability and performance.
What’s Next?
With conduit and cable measurements in place, the next phase will involve pulling the Cat6 cables through their designated hose paths and junction box entries. Once cabling is completed, camera mounting and system integration will follow.
As always, we’re committed to delivering a professional, reliable surveillance solution built for the scale and complexity of ACS Manufacturing Corporation. Stay tuned for our next update as the project continues to take shape.