CCTV Site Inspection at Guadalupe, Nichols Park subdivision.











Introduction.
Ensuring the reliability and performance of surveillance systems is essential in maintaining safety and security within residential communities. On this day, InstallersPH IT Solutions conducted a CCTV site inspection at Guadalupe Nichols Park Subdivision to assess reported issues affecting the existing system. The visit aimed to identify the root cause of the problem, evaluate the impact of recent weather conditions, and recommend the necessary corrective actions to restore full functionality.
Arrival and Initial Assessment.
The technical team started leaving the office at 8:50 AM and arrived at the site at exactly 9:16 AM. Upon arrival, the team coordinated with the property representatives and prepared the necessary tools for inspection. An initial walkthrough was conducted to gain a general overview of the affected areas and to verify which CCTV units were experiencing issues. This early assessment allowed the team to plan a focused approach before proceeding with detailed diagnostics.
Site Inspection and Technical Review.
At 10:07 AM, a site inspection was carried out by Sir Adrian, who led the technical evaluation. This step involved checking camera placements, power points, and visible cabling routes to determine any obvious signs of damage. Particular attention was given to areas exposed to harsh weather, as the subdivision had recently experienced a storm. The inspection confirmed that several components required closer testing, especially those related to power distribution and network connectivity.
Identified Problems and Troubleshooting.
By 11:31 AM, the team had identified the primary concerns. Troubleshooting revealed issues with the 220-volt power supply, which was suspected to be damaged. The unstable or absent power was affecting the operation of several CCTV units, preventing them from powering up properly. In addition, the access point supply installation and structured cabling required further work, as the network infrastructure was also impacted. The storm was considered a major factor, potentially causing surges, interruptions, or physical damage to both power and data lines. Some CCTV cameras were found to be offline, indicating the need for systematic repair and possible replacement of affected components.
Recommendations and Next Steps.
After completing the diagnostics, the team outlined the necessary actions to restore the system. These included thorough power line checking, replacement or repair of damaged supplies, verification of the 220-volt source, and reworking parts of the structured cabling. The access point supply would also need to be stabilized to ensure reliable network connectivity for the cameras. A more detailed maintenance and repair schedule was recommended to prevent similar issues in the future, especially during extreme weather conditions.
Departure and Conclusion.
With the inspection and assessment completed, the team started leaving the site at 11:34 AM and safely arrived back at the office at 12:08 PM. The CCTV site inspection at Guadalupe Nichols Park Subdivision successfully identified the main causes of the system malfunction and provided a clear direction for corrective measures. Through careful evaluation and professional expertise, InstallersPH IT Solutions reaffirmed its commitment to delivering dependable security solutions and ensuring that clients receive timely support to maintain the safety of their communities.
Case Studies
Access Point Site Inspection at Purok Boongon, Tabuelan, Cebu. Introduction. A site inspection was conducted at Purok Boongon, Tabuelan, Cebu to evaluate the feasibility of extending an existing Starlink internet connection to …
CCTV Structured Cabling at Amara Residences- 4th Progress Update.
CCTV Structured Cabling at Amara Residences- 4th Progress Update. Introduction. The fourth progress milestone of the project focuses on the installation and configuration of the network infrastructure within the client’s facility. With …