Structured Cabling Service for Cherubim Security Agency Inc.’s RFID Automatic Boom Barrier –3rd Progress Update.

Introduction
The Structured Cabling Service project for the RFID Automatic Boom Barrier at Cherubim Security Agency Inc. continues to make steady and strategic progress. Led by Installersph IT Solutions, this initiative is designed to enhance access control and streamline vehicle entry through RFID-based automation. In this third progress update, the team remains focused on the ongoing pipelining and structured cabling tasks, with efforts now closing in on the final critical zone—near the placement site of the boom barrier itself. The meticulous work so far reinforces the project’s goal of delivering a secure and high-performance access solution tailored to the client’s operational needs.
Progress on Pipelining and Cabling.
Throughout the past phase, the installation team has maintained a disciplined approach to laying down steel conduit pipes to shield the Cat 6 network cables. This choice has proven essential for physical cable protection, particularly in exposed or high-traffic areas where wear-and-tear, weather, or tampering might pose risks to conventional wiring.
The steel-piped routing now extends through the majority of the designated pathway and is approaching the final stretch where the RFID boom barrier mechanism will be installed. Every section of the steel conduit has been securely anchored and sealed, minimizing movement and exposure that could impact signal stability over time.
The Cat 6 cables continue to be threaded through these steel channels with precision, ensuring there are no kinks, pinches, or sharp bends that could interfere with transmission performance. Each point along the cable path is being tested for continuity and signal integrity as work advances, reducing the risk of errors during final deployment.
Near Completion of Cabling Toward Boom Barrier Area.
The most recent advancement in the project is the nearing completion of the cabling run toward the boom barrier’s foundation point. This zone is key, as it will house the main control unit that interfaces with the RFID reader and the motorized barrier arm. The current focus is on aligning the conduit outlets to match the barrier’s technical requirements, ensuring that once the barrier equipment arrives or is installed, connectivity can be established immediately without delays.
Trenching and surface mounting, depending on the pathway’s condition, have been handled with great care to maintain both structural integrity and safety. The team is also coordinating with the client’s site personnel to ensure the pathway does not interfere with daily operations during this final leg of conduit installation.
Conclusion
As the Structured Cabling Service project for Cherubim Security Agency Inc. enters its final stages, the installation of steel-protected Cat 6 cabling is now almost complete, with the boom barrier location in sight. This milestone brings the team closer to integrating the RFID system components and conducting live testing. The continuous dedication to quality, protection, and signal integrity ensures that the foundation being laid today will support a robust, secure, and future-ready access control system. The final update will focus on system integration and the commissioning phase, marking the completion of this critical security infrastructure upgrade.